New roofs and full re-roofing

A complete strip and re-roof, back to the rafters and rebuilt with new membrane, battens and tiles.

In short

A new roof means stripping the old covering off entirely, checking and repairing the timbers underneath, then rebuilding with breathable membrane, treated battens and new or reclaimed tiles. It is the right call when a roof has reached the end of its life rather than developed a single fault. Most houses take a few days once the scaffold is up.

Signs you need new roofs

  • Repairs are becoming a regular expense rather than a one off
  • Tiles are delaminating, flaking or breaking when they are handled
  • The roofline dips or ripples along the ridge when you look up at it from the pavement
  • Daylight is visible through the boards from inside the loft
  • The felt under the tiles has torn or gone brittle and is shedding grit
  • The roof is the original covering and the house is sixty years old or more

What the job involves

A proper look before a price

We get up on the roof or into the loft rather than pricing it off the pavement. You get told whether it genuinely needs replacing or whether a repair would see you right for another few years.

Scaffold and protection

Scaffold goes up so the work is done safely and properly, and the ground, drive and planting are sheeted before a single tile comes off.

Strip and inspect

The old covering, battens and felt come off and go straight into the skip. With the roof open we check every rafter, purlin and wall plate and tell you there and then if anything has rotted.

Membrane, battens and tiles

Breathable membrane is run out and lapped correctly, treated battens are set to the tile gauge, and the covering goes back on with the correct fixings for the pitch and the exposure.

Ridges, verges and clearing up

Ridge and hip tiles are bedded or dry fixed, verges and flashings are finished, and the site is swept and cleared before we leave.

Want someone to take a look?

Free quote, no obligation, and a straight answer on whether the work is actually needed.

New Roofs near you

We cover Derby, Nottingham, Burton upon Trent and the towns around them.

Frequently asked questions

How long does a new roof take?

A straightforward semi is usually a few days once the scaffold is up. A larger detached property, a complicated hipped roof or bad weather can push that out. We will give you a realistic timescale when we quote rather than an optimistic one.

Do I need scaffolding?

For a full re-roof, yes. It is not an upsell. Stripping a roof safely means somewhere to stand and somewhere to stack tiles, and it is a legal requirement for work at that height.

Can you reuse my existing tiles?

Sometimes. Clay and slate often clean up and go back on, which can save money and keeps the house looking right. Concrete tiles that have started to flake are usually past it. We will tell you which you have got.

Will you replace the felt as well?

Yes. Modern breathable membrane replaces the old bitumen felt as a matter of course on a re-roof. Putting new tiles back over perished felt is the shortcut that causes the next problem.

What happens if you find rotten timbers?

We show you before we cover it back up. Replacing a length of rafter or a section of wall plate is normal on an older roof, and we would rather price it honestly with the roof open than pretend it was not there.

Other services